Red river bridge construction project package 2: Gia Lam Section 09/03/2012

1. Pedestrian box cuvert construction(VB-009)
2. Pile head treatment(VB-10(R1)
3. Boundary Frence Construction(VB-011-ADD1)
4. Worker Supply(VB-012)
5.Technical box culvert Construction(VB-013, VB-014, VB-014ADD2, VB-014ADD9)
6. Sub-Diaphragm. Deck Slab
...