HOTLINE: 08 3775 4361
Home
About us
News
Design
Supervision
Construction
Contact us
Internal information
Category
About us
News
Public works
Civil works
Consulting and solutions
Design
Construction
Photo gallery
Online support
Mr. Tùng
Statistic
Online:
13
Total visit:
460444
New works
Design 2
Red river bridge construction project package 2: Gia Lam Section
Construction
Red river bridge construction project package 2: Gia Lam Section
1. Pedestrian box cuvert construction(VB-009)
2. Pile head treatment(VB-10(R1)
3. Boundary Frence Construction(VB-011-ADD1)
4. Worker Supply(VB-012)
5.Technical box culvert...
Detail
Red river bridge construction project package 1: Gia Lam Section
1. Worker supply (contract VB-002), Pile head Treatment (Vb-005).
2. Precast RC plate fabrication and intallation(VB-007)
3. Construction of Parapet from P21 to P27(VB-010).
4....
Detail
Hot news
US 'committed to Afghan talks' despite Taliban suspension
[ 16/03/2012 ]
The US says it remains committed to Afghan reconciliation despite the suspension of talks by the Taliban.
Weblinks
Weblinks
Univinet
Partner and Advertising